Investor Rehab – Fort Morgan

A six-month, full-gut rehab of a stone and stucco farmhouse for an investor client in Fort Morgan, about 80 miles northeast of Denver.

This was a top-to-bottom turn. Inside, rooms were taken down to the subfloor and studs, and the out-of-level floors were raised and corrected before anything new went in. The cracked basement foundation walls were stitched and repaired, and the house got a new HVAC system and water heater, a new kitchen, LVP flooring, paint, trim, doors, fans and new windows throughout.

Outside, the work was just as extensive: a new roof and gutters, exterior repairs, a covered porch with cedar deck stairs, and the old barn converted into a two-car garage.

Investor rehabs run on a different clock than homeowner remodels. The property isn’t earning until it’s done, so the whole job was scoped, priced and scheduled as one package, with Brimie running every trade from demo through final punch list. Working outside the metro also meant planning deliveries and crew days carefully so nothing sat idle waiting on a part.

Brimie Contractors handles investor and make-ready work across the Front Range, from single rooms to whole-house turns. If you have a property to get rent-ready or market-ready, we’ll walk it and give you a written, itemized scope and estimate.

Before: stone and stucco farmhouse exterior with worn trim and old porch, Fort Morgan
Exterior before
After: fresh stucco, new windows and trim, new covered porch and cedar deck stairs, Fort Morgan
Exterior after
Before: kitchen wall opened to studs and plumbing stub-outs, Fort Morgan
Kitchen before
After: Fort Morgan investor rehab kitchen with white shaker cabinets, quartz counters, new appliances and cedar plank walls
Kitchen after
Before: dark bedroom with worn painted floor, Fort Morgan
Bedroom before
Investor rehab after: finished bedroom with new LVP flooring and fresh paint, Fort Morgan
Bedroom after
Investor rehab before: gutted room with exposed plank walls and debris, Fort Morgan
Demo
Investor rehab before: stripped subfloor and stained walls, Fort Morgan
Subfloor before
Investor rehab after: painted bedroom with new LVP flooring, trim and ceiling fan, Fort Morgan
Bedroom after
Before: cracked basement foundation wall with peeling teal paint and loose wiring, Fort Morgan
Foundation wall before
During: carbon-fiber stitching straps installed across foundation wall cracks, Fort Morgan
Stitching the cracks
After: stitched foundation wall sealed and painted white, Fort Morgan
Stitched and painted
After: basement foundation walls cleaned up and painted white, Fort Morgan
Basement after

Interested in a Similar Project?

Let's discuss how we can help with your renovation.

Contact Us